1 Eliminate all sundries under the ship's bottom as well as sundries in all location in the ship’s moving process
and barriers to impede and impact the airbag rolling.
and barriers to impede and impact the airbag rolling.
2 Mooring rope to the winch movable pulley group,
the moorage rope should satisfy the force of traction request, and must introduce from the bow, tied in with powerful components such as bitt bollard up and, if necessary, can also be tied in part or full-ship hull
the moorage rope should satisfy the force of traction request, and must introduce from the bow, tied in with powerful components such as bitt bollard up and, if necessary, can also be tied in part or full-ship hull
3 Demolish completely the pier block under the ship's bottom, and fills in the trundle airbag according to the computation request's spacing, finally make the ship’s weight completely bear pressure on the trundle airbag.
4 After the staff along with the ship launching finish embarking, remove the ladder, the approach span and so on.
5 Start the winch, and emit the steel wire to make the ship move to the waters with the aid of the trundle airbag
6 Choose whether to enter water fast or continue into water under the winch control
according to the waters and the ramp condition
7 Tow the ship to close to wharf
8 Recycle all the airbags
9 Measure the draught level of ship’s bow and stern, and survey whether there is water leakage in all cabins