推广 热搜: 沉船打捞  护舷  橡胶护舷  气囊下水  打捞  气囊打压  船舶上排  气囊  充气橡胶护舷  船舶下水 

Ship Launching relying on Airbags

   2011-06-08 40
核心提示:Linhai Shipbuilding new technologyMessage from China Taizhou TV Station: Today , a 50000DWT Ocean-going bulk cargo loadi

Linhai Shipbuilding new technology

Message from China Taizhou TV Station: Today , a 50000DWT Ocean-going bulk cargo loading ship built by Jiangsu Hong-Ming Shipyard Co., Ltd, was launched successfully, using the marine ship launching airbags 
     

 

Mingzhou 67, before launching
Mingzhou 67, before launching

before launching, workers are charging air to airbags
before launching, workers are charging air to airbags

Charged airbags, airbags afford all ship weight
Charged airbags, airbags afford all ship weight

huge ship declare to start lauching
huge ship declare to start lauching

electric welding workers are cutting ropes
electric welding workers are cutting ropes

the huge ship rolls on airbags on slipway
the huge ship rolls on airbags on slipway

airbags leave the ship, float on water, launching success
airbags leave the ship, float on water, launching success

Message from China Taizhou TV Station: Today , a 50000DWT Ocean-going bulk cargo loading ship built by Jiangsu Hong-Ming Shipyard Co., Ltd, was launched successfully, using airbags. This success broke the current saying which people think airbags can not launching large-tonnage ships. 

The airbag length 18m, ID1.5M, 130KPA/cm2 after charged, can load 25ton/m, this new technology has many advantage like saving time, easy carrying,  saving money, safe etc. The material is tested in China North Industries Group Corperations non-metallic material Physical testing Center. Production based on CB/T3795-1996 Standard.


In order to ensure the boat MINGZHOU NO.67 launching, sent technical personnel, in conjunction with the factory technical personnel on the ship's weight, the water level, the data of ship's drop stress, arrangement of airbags, air pressure, rolling speed control and anti-collision for well-organized. At 4:00 pm, the support under the boat are all take off, and 52 inflated airbags are completed,179.98 meters long and 30 meters wide, 11.3 meters draft design of the vessel are Ready. With the order, the two cables in the front of the vessel are cut off, and the vessel slowly slide into the river by the airbags. The vessel successfully launch only 5 minutes .Meantime, the airbags leave the ship and float to the surface;All the audience marveled.
  

 
反对 0举报 0 收藏 0 打赏 0评论 0
 
更多>同类学知识
推荐图文
推荐学知识
点击排行
网站首页  |  版权隐私  |  使用协议  |  联系方式  |  关于我们  |  网站地图  |  排名推广  |  广告服务  |  积分换礼  |  网站留言  |  RSS订阅  |  违规举报
Powered By DESTOON